Our work processes are determined by the broad use of of BIM (Building Information Modeling). This is our process management tool which covers the entire design life cycle, extending its coverage from the maintenance activities up to the disposal phase.
Project Management
Thanks to the management of projects in BIM, it is possible to resolve project conflicts before going on site, therefore reducing the risks of mistakes and ensuring a very precise design process.
Analysis of project Interfaces
The correct analysis of the project interfaces allow us to avoid and resolve conflicts between the various stakeholders of a project, facilitating its execution.
Project risk management
Risk identification is based on the technical and financial expertise of the ACOS’ team. These risks are managed in particular with BIM applications and with a careful contractual management and cost estimates.
Address
ACOS SA
Strada Ponte di Valle 34c
6964 Davesco
Svizzera
Contacts
+41 79 620 19 26 This email address is being protected from spambots. You need JavaScript enabled to view it.